Sentral Senayan

TOP > Development Team

Developer & Manager
PT. Senayan Trikarya Sempana
A Joint venture co. of
-Kajima Overseas Asia
-PT. Aditya wirabakti
-Badan Pengelola Bung Karno
Main Contractor:
PT. Kajima Indonesia
Design Architect & Engineers
Kajima Design - Japan
Project Architect
PT. Airmas Asri
Structural Architect
PT Wiratman & Associates
Mechanical & Electrical Engineer
PT Aman Pratama Consultants

CONSTRUCTION, SYSTEMS & FACILITIES

Construction
Reinforced concrete core wall and frame with pre-stressed beams, compliant with Indonesian Seismic Design Code for Buildings 2002.
Power Supply
4150 kVA mains electricity supply.
4000 kVA building electrical load assumption.
2x2000 kVA Mitsubishi generators, 100% backup.
Air Conditioning
4 x 600 TR McQuay chillers.
2 x 800.000 BTU air handling units per floor.
Digital thermostat temperature control.
24 hrs chilled water available for server rooms at tenant cost.
Lighting
500 lux illumination on typical floors.
Telecommunications
1000 telephone lines reserved.
Vertical shaft for fibre optic and standard cable services.
Lift Service
14 Mitsubishi passenger lifts, 7 per zone.
Max load 20 persons/1350 kg.
Low Zone 150 m/min; High Zone 240 m/min Service Lift, max load 24 persons/1600 kg, 150 m/min
Fire & Safety
General, heat and smoke detector alarms.
Automatic sprinkler system.
Public address system.
2 sets of fire stairs with 2 hrs fire resistance rating, dual handrails and emergency lighting and pressurized frresh air.
Car Parking
3700 spaces at Senayan Square.
Executive Washrooms
One per floor, 3/F - 28/F, including shower cubicle.
Pantry & Ablutions
One wet pantry and ablution area per floor.
Prayer Room
M&F facilities at basement level.
Helipad
On the roof